Unit Bathroom - Installation


 

Goto PARMA page

Related links

Depending on the structural system and project schedule, two possible installation methods can be  adopted:

 

 

Step One      

Lifting unit from truck

Step Two

1) Top Down

 

2) Sideways

 

 

.

Step Three  

Unit in final position, services are connected

 

Eastern Pretech (Malaysia) Sdn. Bhd. (184774-P)
No 28, Jalan 7/108C, Taman Sungai Besi, 57100 Kuala Lumpur, Malaysia

Tel: +603-7980 2728, Fax: +603-7980 5662,

Copyright ã 2005, Eastern Pretech, All rights Reserved.

Last update on 13 July 2005